Current Projects

image

Evacuation, River / Road Transportation

Evacuation, River / Road Transportation and export of Fly Ash under long term allotments and contracts from Thermal Power Stations for end utilization in cement manufacturing via the Indo-Bangla Protocol Trade route.

Total Quantity: 80,000 M.T per Month
Contract Value: Rs.90 Crores per annum
image

NHAI - NHDP-III

Widening of the existing two lanes to four lanes including strengthening of existing two lanes in Haldia districts in the State of West Bengal by NHAI under NHDP-III program

Contract Value: Rs.20 Crores
image

Excavation and Evacuation of Ash Ponds

Excavation and Evacuation of Ash Ponds and HEL by engaging in earth moving machineries including removal of bottom ash at Haldia Energy Limited.

Total Quantity: 2,00,000 cubic mtr per Month
Contract Value: Rs.10 Crores
image

Classifier Project

We are pleased to inform you that our State of the Art “Classifier Project” is operating at Bagnan, Distt-Howrah, West Bengal. The Classifier Plant and equipment has been imported from USA. Our Classified Fly Ash will have consistent retention of 10% on 45 Micron sieve.

Completed Projects:

Particulars

Value (In Rs)

Duration

Power Plants & Power Stations:

 
 

MARSHALL CORPORATION LTD. has executed works in the Power Plant at Budge Budge Generating Station of 2 X 250 MW capacity for the under mentioned contracts

8520 Lakhs

1992-98

Driven Cast-in-situ RRC Piles, Pile caps, Equipment Foundations and Power House Building, Superstructure up to operating floor.

1200 Lakhs

1992-98

General, Civil & Architectural works for Power House, Mill Buildings & Elevators

900 Lakhs

1994-98

Civil works for Auxiliary plant Building at Budge Budge

1371 Lakhs

1994-99

General, Civil & Architecture for Coal Handling Plant

4992 Lakhs

1994-99

Civil works for Auxiliary plant Building at Budge Budge

3282 Lakhs

1997-98

MARSHALL has the proud privilege to have executed a Contract Agreement with ROLLS ROYCE INDUSTRIAL POWER (INDIA) LTD., having registered Office at NEI House, Regent Centre, Newcastle-upon-Tyne, NE3 3SB, England, for the complete construction of all the Civil Structures for the 2 x 250 MW BALAGARH THERMAL POWER PROJECT to be constructed on Balagarh Island. The owner of this Project BALAGARH POWER COMPANY LIMITED, a company promoted by CESC Ltd. OF RPG enterprise, Calcutta, which has entrusted the complete construction of the Project on a Turnkey Basis to ROLLS-ROYCE INDUSTRIAL POWER (INDIA) LTD. The value of the Civil construction work to be executed by MARSHALL amount Rs. 360.00 Crores (approx.)

360 Crores

1995-96

Building Constructions & Other Works

 
 

Entire handling of the Raw Material Stockyard at Rourkela Steel Plant for continuous 7 years

1500 Lakhs

1960-66

Completed 4 multistoried buildings (two 10 storied and two 15 storied) under MES at Vizag

600 Lakhs

1986-89

Executed a Housing Project comprising of 555 nos. quarters under MES/Dehradun

1000 Lakhs

1985-90

Site leveling works at Bokaro Steel Plant

600 Lakhs

 

Completed Piling works of 15,000 nos. RCC cast-in-situ piles 550 mm dia in the steel Plant at Vizag

500 Lakhs

1986-88

Completed 6 storied hexagonal shaped Administrative Building for Vizag Port Trust amounting to Rs. 50 million including 600 mm dia 27 meter long R.C.C. Cast-in-situ piles

500 Lakhs

1987-90

2 nos. RTS Station Buildings for Metro Railway at Calcutta

200 Lakhs

1982-88

Executed Housing Complex comprising of 4 nos. storied flat type residential buildings under MES at Vizag.

500 Lakhs

1987-90

Executed 2 nos. 3 storied Ware houses under MES / Vizag

300 Lakhs

1987-90

Provision of Married accommodation for Sailors at Nausenabaug. Vishakhapatnam (MES)

207 Lakhs

1986-89

Excavation and transport of earth in millions of cubic meter for Metro Railway with MCL's Excavator and Dumpers.

 
 

Provision for Married accommodation for 18LT CDR's and 54LT'sat Naval Park Extension. Vishakhapatnam (MES)

255 Lakhs

1987-90

Construction of Administrative Office Building at Vishakhapatnam Dock Labour Board at Vishakhapatnam (Vishakhapatnam Port Trust)

109 Lakhs

1987-90

Construction of provision of separated families accommodations for Officers/ J.C.O.S / O.R.S at Dehradun (MES)

93.78 Lakhs

1988-90

Construction of Kendriya Vidyalaya Type B at Raipur, Dehradun (MES)

67.40 Lakhs

1988-91

Construction of Kendriya Vidyalaya Type B and Quarters at Raipur, Dehradun (MES)

87.48 Lakhs

1988-91

Construction of 8 Blocks Staff Quarters for Married Civilian at Raipur, Dehradun (MES)

66.35 Lakhs

1989-91

Construction of Additional Two Floors on Administrative Office Building of M/s Dock Labour Bopard in Port Area including Lift Machine Room (Vishakhapatnam Port Trust)

40 Lakhs

1989-91

Construction of Sewage Disposal and area Drainage for Type-III Quarter at Raipur, Dehradun (MES)

18.52Lakhs

1988-90

Provision of Multistoried Married accommo-dation for 36LT CDR's at Naval Park Extension of MES at Vishakhapatnam.

150 Lakhs

1986-89

Ore & Flux wagon tipper house in RMHS Zone at Vishakhapatnam Steel Project (HSCL)

5.38Lakhs

1986-88

250mm/550mm diameter piling work in C079, C083 Stockbins and Gallery between JH 16 and 17 in RMHS Zone at Vishakhapatnam Steel Project (HSCL)

10 Lakhs

1986-87

250mm/550mm diameter piling work in Conveyor 80 & 82 in RMHS Zone at Vishakhapatnam Steel Project (HSCL)

6.47 Lakhs

1986-87

250mm diameter piling work in Concast Area of SMS Zone at Vishakhapatnam Steel Projet (HSCL)

3.26 Lakhs

1987-88

Road Construction

 
 

Construction of Embankment of widening works or NH-6 from 2 lanes to 4 lanes from Km 72.00 to Km 87.00 under H.C.C

1000 Lakhs

2001-03

Award of transportation and Delivery of Fly Ash from KTPS to work stretch from Km 72.00 to Km. 23.00 OF NH-6 under RBM - PATI

500 Lakhs

2003-05